Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model
|
QGF-100
|
QGF-300
|
QGF-450
|
QGF-600
|
QGF-900
|
QGF-1200
|
QGF-2000
|
Number of filling heads
|
1
|
2
|
3
|
4
|
8
|
12
|
16
|
Filling capacity(L)
|
18.9
|
||||||
Barrel size (mm)
|
φ270×490
|
||||||
Production capacity (b/n)
|
100-120
|
200-240
|
300-400
|
600
|
900
|
1200
|
2000
|
Gas pressure (Mpa)
|
0.4-0.6
|
0.4-0.6
|
0.6
|
0.6
|
0.6
|
0.6
|
0.6
|
Machinery Capacity
Application
1.heavy machinebe packed
in wooden case
2. machines be packed in thick plastic films
Automatic 5 Gallon 18.9L Bottle Barrel Water Washing Filling Capping Machine
Shanghai
Q: How long is your delivery cycle after you order the machinery? A: Generally it is 40 working days.
Q: Do you have a relevant after-sales system? A: We have a Perfect after-sales system. 1: 12 months warranty. 2: Many-to-one service, we will solve basic problems through phone, email, whatsapp, WeChat and video calls. The operation manual will be sent with the machine or via e-mail. 3: If conditions permit, the engineer will go to the buyer's factory to install and test the machine, and train the buyer's staff on how to operate and maintain the machine.
Q: If I want to buy a machine, what information do I need to tell you? A: 1: What liquid do you want to fill? 2: What is the capacity and height of the bottle? 3: What is the output in one hour? 4: Related water quality analysis reports, etc. 5: Required mechanical voltage
Q:How to ensure that you deliver goods on time and ensure the safety of my funds? 1:We guarantee the on-time delivery and quality of the equipment you purchase through the credit insurance service. 2:With the letter of credit, you can easily lock in the delivery time. 3:After visiting the factory/video watching the factory, you can ensure the authenticity of our bank account.
Q:How do you ensure the quality of the machine? 1:To ensure the accuracy of parts. We are equipped with a variety of professional processing equipment, plus professional processing methods accumulated over the years. 2:Before the machine is assembled, each part is inspected by the inspector. 3:Assemble machines, all with masters with more than 5 years of work experience to operate. 4:After all the equipment is completed, we will connect all the machines and allow at least 12 hours for a complete production line to test its stability.